SINTERING SCHEDULE

SINTERING SCHEDULE
“90-minute Sintering” is now possible for 3-unit Bridges.

For 4-unit bridge or over, General Sintering Program is required

General Sintering

Program Setting 1
UTMLSTML ML/HT LT
High Temperature 1550°C / 2822°F 1500°C / 2732°F
Hold Time 2 hours 2 hours
Rate of Temperature Increase 10°C / 18°F minute 10°C / 18°F minute
Rate of Temperature Decrease -10°C / -18°F minute -10°C / -18°F minute

Fast Sintering

Program Setting 2
UTMLSTML ML/HT LT
High Temperature 1560°C / 2840°F 1515°C / 2759°F
Hold Time 30 minutes 30 minutes
Rate of Temperature Increase 35°C / 95°F minute 35°C / 95°F minute
Rate of Temperature Decrease -45°C / -49°F minute -45°C / -49°F minute
Sintering Schedule *The material is removed from the furnace at 800°C, and is for Up to a 3-unit Bridge.